The storage areas include 6 supply gates and 2 loading ramps accessible from both sides of the building (cross-dock)
The hall is connected to all IS networks / water, gas, electricity, sewage, the hall is heated from a central boiler room and the hall is equipped with EPS. The floor in the hall has a load capacity of 5t/m2, it is concrete with an epoxy dust-free finish
The area is guarded 24/7 by SBS, monitored by a CCTV camera system
Access to the area by truck. Outdoor parking spaces for trucks and cars